Bolivia Hill Upgrade – New England Highway, NSW
Caporn Piling delivered specialist foundation works for the Bolivia Hill Upgrade on the New England Highway in Northern New South Wales. The project, located 35km south of Tenterfield, included a 320-metre-long bridge and 2.1km of upgraded road to enhance safety, transport productivity, and travel efficiency on this critical route.
Project Scope
Installation of 8 permanent cased bored piles (1050mm diameter), socketed into extremely high-strength granite, ensuring stability and durability for the new bridge structure.
Equipment Utilised
Bauer BG15 drill rig for precision pile installation.
1050mm diameter cluster hammer for challenging rock penetration.
3 x 1100 CFM compressors for high-powered drilling support.
Kobelco CKE1800 crawler crane for lifting and operational support.
8T excavator for site preparation and auxiliary works.
Client
Georgiou SRG Joint Venture
Project Highlights
Construction of a 320m-long bridge to bypass the challenging terrain of Bolivia Hill.
Piles installed into high-strength granite, requiring advanced drilling techniques and specialized equipment.
Delivery of a complex project in a remote location, requiring precision and innovation to overcome geotechnical challenges.
Caporn Piling delivered specialist foundation works for the Bolivia Hill Upgrade on the New England Highway in Northern New South Wales. The project, located 35km south of Tenterfield, included a 320-metre-long bridge and 2.1km of upgraded road to enhance safety, transport productivity, and travel efficiency on this critical route.
Project Scope
Installation of 8 permanent cased bored piles (1050mm diameter), socketed into extremely high-strength granite, ensuring stability and durability for the new bridge structure.
Equipment Utilised
Bauer BG15 drill rig for precision pile installation.
1050mm diameter cluster hammer for challenging rock penetration.
3 x 1100 CFM compressors for high-powered drilling support.
Kobelco CKE1800 crawler crane for lifting and operational support.
8T excavator for site preparation and auxiliary works.
Client
Georgiou SRG Joint Venture
Project Highlights
Construction of a 320m-long bridge to bypass the challenging terrain of Bolivia Hill.
Piles installed into high-strength granite, requiring advanced drilling techniques and specialized equipment.
Delivery of a complex project in a remote location, requiring precision and innovation to overcome geotechnical challenges.