0
Skip to Content
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Home
Folder: What We Do
Back
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Folder: Who We Are
Back
Our History
Our Team
Our Strategy
Careers
Folder: Contact
Back
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Bravus-Mine-Access-Road.jpg.jpeg

Bravus Mine Access Road – Carmichael Mine, QLD

$0.00

Caporn Piling delivered specialist piling works for the Moray-Carmichael Boundary Road Upgrade at the Carmichael Mine, also known as the Mine Access Road (MAR). This essential upgrade improves road infrastructure, ensuring safer and more reliable access for heavy vehicles, even in challenging wet weather conditions.

Project Scope

  • Installation of 15 prestressed concrete driven piles to support two new bridges along the upgraded access road.

Equipment Utilized

  • Manitowoc M12000 crawler crane with piling leader attachment for precision-driven piling.

  • Juntann HHK16S Impact Hammer for pile installation.

  • Sany SCC 1500C crawler crane for lifting and support operations.

Client: Whittens

Project Highlights

  • The upgrades included sealing both Elgin Road and Moray-Carmichael Boundary Road with durable asphalt, replacing unsealed surfaces to better accommodate heavy vehicles.

  • Installation of new stormwater drainage culverts, cattle grids, and road furniture to improve safety and reliability.

  • Works were carried out in full compliance with more than 40 environmental and Cultural Heritage approvals, ensuring minimal environmental impact and preservation of cultural values.

Project Benefits

  • Enhanced road safety and reliability for mine operations, particularly during wet weather conditions.

  • Improved infrastructure to support heavy vehicle access, vital for the Carmichael Mine's long-term operations.

  • Careful consideration of environmental and cultural heritage conditions, setting a benchmark for sustainable construction practices.

At Caporn Piling, we are committed to delivering efficient and reliable piling solutions for infrastructure projects in sensitive and challenging environments. Our expertise ensures the long-term resilience of key access routes, supporting both industry and environmental stewardship.

Projects Bravus Mine Access Road – Carmichael Mine, QLD
Quantity:
Add To Cart

Caporn Piling delivered specialist piling works for the Moray-Carmichael Boundary Road Upgrade at the Carmichael Mine, also known as the Mine Access Road (MAR). This essential upgrade improves road infrastructure, ensuring safer and more reliable access for heavy vehicles, even in challenging wet weather conditions.

Project Scope

  • Installation of 15 prestressed concrete driven piles to support two new bridges along the upgraded access road.

Equipment Utilized

  • Manitowoc M12000 crawler crane with piling leader attachment for precision-driven piling.

  • Juntann HHK16S Impact Hammer for pile installation.

  • Sany SCC 1500C crawler crane for lifting and support operations.

Client: Whittens

Project Highlights

  • The upgrades included sealing both Elgin Road and Moray-Carmichael Boundary Road with durable asphalt, replacing unsealed surfaces to better accommodate heavy vehicles.

  • Installation of new stormwater drainage culverts, cattle grids, and road furniture to improve safety and reliability.

  • Works were carried out in full compliance with more than 40 environmental and Cultural Heritage approvals, ensuring minimal environmental impact and preservation of cultural values.

Project Benefits

  • Enhanced road safety and reliability for mine operations, particularly during wet weather conditions.

  • Improved infrastructure to support heavy vehicle access, vital for the Carmichael Mine's long-term operations.

  • Careful consideration of environmental and cultural heritage conditions, setting a benchmark for sustainable construction practices.

At Caporn Piling, we are committed to delivering efficient and reliable piling solutions for infrastructure projects in sensitive and challenging environments. Our expertise ensures the long-term resilience of key access routes, supporting both industry and environmental stewardship.

Projects Bravus Mine Access Road – Carmichael Mine, QLD

Expert Piling Solutions Start Here – Request a Quote Now

Contact Us for Expert Piling Advice
Name *

Thanks for your enquiry.
Our expert team will be in touch shortly.

Queensland Head Office

139-169 Potassium Street
Narangba, QLD 4504
P: +61 7 3889 3989
E: admin@capornpiling.com.au

Queensland Gold Coast

18/240 Varsity Parade
Varsity Lakes, Qld 4227
P: +61 7 38893989
E: admin@capornpiling.com.au

New South Wales Office

30-32 Barcoo Street
Roseville, NSW 2069
P: +61 2 9882 3817
E: admin@capornpiling.com.au

South Australia Office

22 Greenhill Road
Wayville, SA 5034
P: +61 8 8372 7808
E: admin@capornpiling.com.au


Featured Projects
Bored Piles
CFA Piles
Design & Construct
Marine Piles

Driven Concrete Piles
Down the Hole Hammer
Driven Steel Tubular Piles
Retaining Walls
Ground Improvement

Specialist Applications
Support Fluids
Temporary Access Bridges
FAQ’s

Copyright © 2025 Caporn Piling