0
Skip to Content
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Home
Folder: What We Do
Back
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Folder: Who We Are
Back
Our History
Our Team
Our Strategy
Careers
Folder: Contact
Back
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
burnside.jpg.jpeg

Burnside Village Shopping Centre – Stage 6, SA

$0.00

Caporn Piling is proud to support the Stage 6 development of the iconic Burnside Village Shopping Centre in South Australia. This expansion project includes the construction of 18,500m² of additional floor space and two basement car park levels, providing enhanced amenities for shoppers and the local community.

Project Scope

  • Installation of:

    • 1,203 CFA piles (600mm, 750mm, and 900mm diameter, up to 19m deep) for a soldier pile retaining wall.

    • 110 temporary anchors ranging from 15m to 20m in length for structural stability.

    • 9 CFA piles (600mm and 900mm diameter, up to 17m deep) for foundation support.

Equipment Utilized

  • Bauer BG28 piling rig for efficient CFA pile installation.

  • Track-mounted concrete pump for seamless concrete delivery.

  • Soilmec SM14 for precision anchor installation.

Client

McMahon Services

Project Highlights

  • Delivery of extensive CFA piling solutions for the basement retaining wall and foundation structure.

  • Installation of temporary anchors to ensure structural stability during excavation and construction.

  • Execution in a congested urban environment, requiring precise planning and innovative construction methods.

Projects Burnside Village Shopping Centre – Stage 6, SA
Quantity:
Add To Cart

Caporn Piling is proud to support the Stage 6 development of the iconic Burnside Village Shopping Centre in South Australia. This expansion project includes the construction of 18,500m² of additional floor space and two basement car park levels, providing enhanced amenities for shoppers and the local community.

Project Scope

  • Installation of:

    • 1,203 CFA piles (600mm, 750mm, and 900mm diameter, up to 19m deep) for a soldier pile retaining wall.

    • 110 temporary anchors ranging from 15m to 20m in length for structural stability.

    • 9 CFA piles (600mm and 900mm diameter, up to 17m deep) for foundation support.

Equipment Utilized

  • Bauer BG28 piling rig for efficient CFA pile installation.

  • Track-mounted concrete pump for seamless concrete delivery.

  • Soilmec SM14 for precision anchor installation.

Client

McMahon Services

Project Highlights

  • Delivery of extensive CFA piling solutions for the basement retaining wall and foundation structure.

  • Installation of temporary anchors to ensure structural stability during excavation and construction.

  • Execution in a congested urban environment, requiring precise planning and innovative construction methods.

Projects Burnside Village Shopping Centre – Stage 6, SA

Expert Piling Solutions Start Here – Request a Quote Now

Contact Us for Expert Piling Advice
Name *

Thanks for your enquiry.
Our expert team will be in touch shortly.

Queensland Head Office

139-169 Potassium Street
Narangba, QLD 4504
P: +61 7 3889 3989
E: admin@capornpiling.com.au

Queensland Gold Coast

18/240 Varsity Parade
Varsity Lakes, Qld 4227
P: +61 7 38893989
E: admin@capornpiling.com.au

New South Wales Office

30-32 Barcoo Street
Roseville, NSW 2069
P: +61 2 9882 3817
E: admin@capornpiling.com.au

South Australia Office

22 Greenhill Road
Wayville, SA 5034
P: +61 8 8372 7808
E: admin@capornpiling.com.au


Featured Projects
Bored Piles
CFA Piles
Design & Construct
Marine Piles

Driven Concrete Piles
Down the Hole Hammer
Driven Steel Tubular Piles
Retaining Walls
Ground Improvement

Specialist Applications
Support Fluids
Temporary Access Bridges
FAQ’s

Copyright © 2025 Caporn Piling