Caporn Piling is proud to support the Stage 6 development of the iconic Burnside Village Shopping Centre in South Australia. This expansion project includes the construction of 18,500m² of additional floor space and two basement car park levels, providing enhanced amenities for shoppers and the local community.

Project Scope

  • Installation of:

    • 1,203 CFA piles (600mm, 750mm, and 900mm diameter, up to 19m deep) for a soldier pile retaining wall.

    • 110 temporary anchors ranging from 15m to 20m in length for structural stability.

    • 9 CFA piles (600mm and 900mm diameter, up to 17m deep) for foundation support.

Equipment Utilized

  • Bauer BG28 piling rig for efficient CFA pile installation.

  • Track-mounted concrete pump for seamless concrete delivery.

  • Soilmec SM14 for precision anchor installation.

Client

McMahon Services

Project Highlights

  • Delivery of extensive CFA piling solutions for the basement retaining wall and foundation structure.

  • Installation of temporary anchors to ensure structural stability during excavation and construction.

  • Execution in a congested urban environment, requiring precise planning and innovative construction methods.

Caporn Piling is proud to support the Stage 6 development of the iconic Burnside Village Shopping Centre in South Australia. This expansion project includes the construction of 18,500m² of additional floor space and two basement car park levels, providing enhanced amenities for shoppers and the local community.

Project Scope

  • Installation of:

    • 1,203 CFA piles (600mm, 750mm, and 900mm diameter, up to 19m deep) for a soldier pile retaining wall.

    • 110 temporary anchors ranging from 15m to 20m in length for structural stability.

    • 9 CFA piles (600mm and 900mm diameter, up to 17m deep) for foundation support.

Equipment Utilized

  • Bauer BG28 piling rig for efficient CFA pile installation.

  • Track-mounted concrete pump for seamless concrete delivery.

  • Soilmec SM14 for precision anchor installation.

Client

McMahon Services

Project Highlights

  • Delivery of extensive CFA piling solutions for the basement retaining wall and foundation structure.

  • Installation of temporary anchors to ensure structural stability during excavation and construction.

  • Execution in a congested urban environment, requiring precise planning and innovative construction methods.