Burrill Lake Bridge, NSW
Caporn Piling is proud to support the construction of the Burrill Lake 290-meter-long bridge, set on a new alignment east of the existing structure. This vital infrastructure project enhances connectivity and ensures a modern, efficient crossing for the community.
Project Scope:
Installation of 8 bored piles (1050mm diameter, 25m deep)
Installation of 30 bored piles (1500mm diameter, 25m deep)
32 piles on land and 6 piles over water
Equipment:
To execute this complex project, Caporn Piling utilized an array of advanced equipment including:
Bauer BG28 Drill Rig
130tn and 110tn Crawler Cranes
Workboat
ICE 110C Vibrator
5 x 12m spans of temporary access Bridge.
In collaboration with BGC Contracting, Caporn Piling is proud to deliver precise, reliable piling solutions, laying the groundwork for this remarkable bridge that will serve the region for years to come.
Caporn Piling is proud to support the construction of the Burrill Lake 290-meter-long bridge, set on a new alignment east of the existing structure. This vital infrastructure project enhances connectivity and ensures a modern, efficient crossing for the community.
Project Scope:
Installation of 8 bored piles (1050mm diameter, 25m deep)
Installation of 30 bored piles (1500mm diameter, 25m deep)
32 piles on land and 6 piles over water
Equipment:
To execute this complex project, Caporn Piling utilized an array of advanced equipment including:
Bauer BG28 Drill Rig
130tn and 110tn Crawler Cranes
Workboat
ICE 110C Vibrator
5 x 12m spans of temporary access Bridge.
In collaboration with BGC Contracting, Caporn Piling is proud to deliver precise, reliable piling solutions, laying the groundwork for this remarkable bridge that will serve the region for years to come.