Kangaroo Island Ports Refurbishment, SA

$0.00

The upgrade of the Penneshaw and Cape Jervis ports is a vital project enhancing safety, efficiency, and connectivity for visitors, freight, and tourism on Kangaroo Island and the Fleurieu Peninsula. These upgraded ports will support quicker, safer trips while bolstering South Australia's reputation for world-class produce and travel experiences.

Project Scope:

  • Installation of 39 cased bored piles (610mm and 762mm in diameter) up to 20 meters in length

  • Piles installed from temporary jetty structures and a jack-up barge

Project Value: $10,500,000

Equipment:

  • BG24H

  • ICE 58B Vibratory Hammer

  • DTH Hammer

  • Flydrill

  • 9t Junttan Impact Hammer.

In collaboration with McMahon Services Australia Pty Ltd, Caporn Piling is proud to contribute to this critical infrastructure project, supporting South Australia's tourism and freight industries while ensuring safe and efficient port operations for years to come.

The upgrade of the Penneshaw and Cape Jervis ports is a vital project enhancing safety, efficiency, and connectivity for visitors, freight, and tourism on Kangaroo Island and the Fleurieu Peninsula. These upgraded ports will support quicker, safer trips while bolstering South Australia's reputation for world-class produce and travel experiences.

Project Scope:

  • Installation of 39 cased bored piles (610mm and 762mm in diameter) up to 20 meters in length

  • Piles installed from temporary jetty structures and a jack-up barge

Project Value: $10,500,000

Equipment:

  • BG24H

  • ICE 58B Vibratory Hammer

  • DTH Hammer

  • Flydrill

  • 9t Junttan Impact Hammer.

In collaboration with McMahon Services Australia Pty Ltd, Caporn Piling is proud to contribute to this critical infrastructure project, supporting South Australia's tourism and freight industries while ensuring safe and efficient port operations for years to come.