Cape River Bridge, QLD
Caporn Piling was proud to play a key role in the Cape River Bridge Upgrade, a vital infrastructure project enhancing road safety and accessibility along the Gregory Developmental Road between Charters Towers and Emerald. Part of the Government's $77 million investment, the upgrade ensures improved freight access, reduced road closures due to flooding, and safer driving conditions for local communities.
Project Scope
Installation of:
88 precast concrete piles (550mm diameter, up to 21m long) for the new bridge structure.
Equipment Utilised
Woltman THW 7528-D for precision piling.
Manitowoc M12000 crane for heavy lifting operations.
16T Hydraulic Impact Hammers for efficient pile driving.
Client
Civil, Mining and Construction (CMC)
Caporn Piling was proud to play a key role in the Cape River Bridge Upgrade, a vital infrastructure project enhancing road safety and accessibility along the Gregory Developmental Road between Charters Towers and Emerald. Part of the Government's $77 million investment, the upgrade ensures improved freight access, reduced road closures due to flooding, and safer driving conditions for local communities.
Project Scope
Installation of:
88 precast concrete piles (550mm diameter, up to 21m long) for the new bridge structure.
Equipment Utilised
Woltman THW 7528-D for precision piling.
Manitowoc M12000 crane for heavy lifting operations.
16T Hydraulic Impact Hammers for efficient pile driving.
Client
Civil, Mining and Construction (CMC)