Coomera Connector – Stage 1, QLD
The Coomera Connector is a 45-kilometre transport corridor designed to reduce congestion and improve connectivity between the Logan Motorway–Pacific Motorway interchange at Loganholme and Nerang-Broadbeach Road. As part of Stage 1, Caporn Piling delivered critical piling works for multiple bridge structures along the route, ensuring a strong and reliable foundation for this key infrastructure project.
Project Scope:
Bridge 5: 23 bored piles (1,200mm diameter), up to 19m deep, plus 2 oversized liners
Bridge 7: 3 bored piles (1,200mm diameter), 4m deep
Bridge 3: 104 high-cutoff bored piles (900mm, 1,200mm, and 1,500mm diameter), up to 30m deep
Bridge 6: 15 bored piles (1,200mm diameter), up to 17m deep
Bridge 9 Abutment A: 26 bored piles (900mm, 1,200mm, and 1,500mm diameter), up to 14m deep
Bridges 10, 11, 12: 27 bored piles (1,200mm diameter), up to 19m deep
Project Value:
Approximately $19,500,000
Equipment:
BG28 Piling Rig
14T Excavator
110T Crawler Crane
Liebherr 110 Concrete Line Pump
In partnership with FHHM JV (Fulton Hogan, JF Hull, McIlwain), Caporn Piling played a key role in delivering the deep foundation works for this major Queensland transport project, ensuring long-term resilience and improved travel efficiency for the region.
The Coomera Connector is a 45-kilometre transport corridor designed to reduce congestion and improve connectivity between the Logan Motorway–Pacific Motorway interchange at Loganholme and Nerang-Broadbeach Road. As part of Stage 1, Caporn Piling delivered critical piling works for multiple bridge structures along the route, ensuring a strong and reliable foundation for this key infrastructure project.
Project Scope:
Bridge 5: 23 bored piles (1,200mm diameter), up to 19m deep, plus 2 oversized liners
Bridge 7: 3 bored piles (1,200mm diameter), 4m deep
Bridge 3: 104 high-cutoff bored piles (900mm, 1,200mm, and 1,500mm diameter), up to 30m deep
Bridge 6: 15 bored piles (1,200mm diameter), up to 17m deep
Bridge 9 Abutment A: 26 bored piles (900mm, 1,200mm, and 1,500mm diameter), up to 14m deep
Bridges 10, 11, 12: 27 bored piles (1,200mm diameter), up to 19m deep
Project Value:
Approximately $19,500,000
Equipment:
BG28 Piling Rig
14T Excavator
110T Crawler Crane
Liebherr 110 Concrete Line Pump
In partnership with FHHM JV (Fulton Hogan, JF Hull, McIlwain), Caporn Piling played a key role in delivering the deep foundation works for this major Queensland transport project, ensuring long-term resilience and improved travel efficiency for the region.