Hexham Straight Widening, NSW
The Hexham Straight Widening (HSW) Project is a key transport infrastructure upgrade, expanding a six-kilometre section of the Pacific Highway (Maitland Road) from four lanes to six lanes. This major project aims to enhance traffic flow, improve freight efficiency, and increase road safety on one of New South Wales’ busiest transport corridors.
Project Scope:
13 bored piles (900mm, 1050mm, 1200mm, 1500mm diameter), up to 40m deep
15 driven steel tubes (900mm, 1050mm, 1500mm diameter), up to 65m deep
Project Value:
Approximately $7,300,000
Equipment:
BG28 Piling Rig
Junttan HHX350
ICE 58B Vibrator
300T Crawler Crane
14T Excavator
EWP
Working in collaboration with Georgiou, Daracon, and SMEC Alliance, Caporn Piling provided specialist foundation works, ensuring a strong and stable base for this vital highway expansion.
The Hexham Straight Widening (HSW) Project is a key transport infrastructure upgrade, expanding a six-kilometre section of the Pacific Highway (Maitland Road) from four lanes to six lanes. This major project aims to enhance traffic flow, improve freight efficiency, and increase road safety on one of New South Wales’ busiest transport corridors.
Project Scope:
13 bored piles (900mm, 1050mm, 1200mm, 1500mm diameter), up to 40m deep
15 driven steel tubes (900mm, 1050mm, 1500mm diameter), up to 65m deep
Project Value:
Approximately $7,300,000
Equipment:
BG28 Piling Rig
Junttan HHX350
ICE 58B Vibrator
300T Crawler Crane
14T Excavator
EWP
Working in collaboration with Georgiou, Daracon, and SMEC Alliance, Caporn Piling provided specialist foundation works, ensuring a strong and stable base for this vital highway expansion.