Isle of Capri Bridge, QLD
The Isle of Capri Bridge Upgrade is a vital infrastructure project improving connectivity between Surfers Paradise and the Isle of Capri. Spanning 135 meters across the Nerang River, the new four-lane bridge will significantly ease congestion, enhancing traffic flow and access for commuters and businesses in the area.
Project Scope:
Installation of 32 permanent lined bored piles, approximately 45 meters deep
12-16 piles installed via barge, 4-8 piles installed via FW (2-4 spans)
12 LB piles and FW load-out jetty (1-2 spans)
Project Value:
$12,000,000
Equipment:
Caporn Piling deployed industry-leading equipment to complete the works efficiently, including:
BG28V 3514 + 4m extension
BK28/419/4/64
Long Auger 6m 1350
1 x 110t Crane
2 x 250t Cranes
Junttan 16t hammer + powerpack
In collaboration with Georgiou Group, Caporn Piling is proud to contribute to this essential transport upgrade, improving access and connectivity for one of Queensland’s busiest urban corridors.
The Isle of Capri Bridge Upgrade is a vital infrastructure project improving connectivity between Surfers Paradise and the Isle of Capri. Spanning 135 meters across the Nerang River, the new four-lane bridge will significantly ease congestion, enhancing traffic flow and access for commuters and businesses in the area.
Project Scope:
Installation of 32 permanent lined bored piles, approximately 45 meters deep
12-16 piles installed via barge, 4-8 piles installed via FW (2-4 spans)
12 LB piles and FW load-out jetty (1-2 spans)
Project Value:
$12,000,000
Equipment:
Caporn Piling deployed industry-leading equipment to complete the works efficiently, including:
BG28V 3514 + 4m extension
BK28/419/4/64
Long Auger 6m 1350
1 x 110t Crane
2 x 250t Cranes
Junttan 16t hammer + powerpack
In collaboration with Georgiou Group, Caporn Piling is proud to contribute to this essential transport upgrade, improving access and connectivity for one of Queensland’s busiest urban corridors.