The M1 to Raymond Terrace Extension is a major 15-kilometre upgrade of the Pacific Motorway, designed to enhance connectivity, improve traffic flow, and increase freight efficiency in New South Wales. This significant infrastructure project includes the construction of nine new bridges, including a 2.7-kilometre viaduct across the Hunter River, providing a vital transport link for the region.
Project Scope:
Bored piles: 73 (1,050mm diameter), 29 (1,500mm diameter), 8 (1,800mm diameter)
Driven steel tubular (DST) piles: 10 (900mm diameter), 95 (1,500mm diameter), 28 (1,800mm diameter)
Sheet piling: 65 metres of sheet piling for the causeway jetty
Project Value:
Approximately $58,000,000
Equipment:
2 x BG28 Piling Rigs
M12000 Crane + Leader and M16000 Crane
30SB Junttan Impact Hammer
ICE 58B and ICE 110 Vibratory Hammer
CKE2500 Crane
Partnering with John Holland / Gamuda Joint Venture, Caporn Piling played a key role in delivering the deep foundation works for this transformational transport project, ensuring a safer, more efficient motorway network for New South Wales.
The M1 to Raymond Terrace Extension is a major 15-kilometre upgrade of the Pacific Motorway, designed to enhance connectivity, improve traffic flow, and increase freight efficiency in New South Wales. This significant infrastructure project includes the construction of nine new bridges, including a 2.7-kilometre viaduct across the Hunter River, providing a vital transport link for the region.
Project Scope:
Bored piles: 73 (1,050mm diameter), 29 (1,500mm diameter), 8 (1,800mm diameter)
Driven steel tubular (DST) piles: 10 (900mm diameter), 95 (1,500mm diameter), 28 (1,800mm diameter)
Sheet piling: 65 metres of sheet piling for the causeway jetty
Project Value:
Approximately $58,000,000
Equipment:
2 x BG28 Piling Rigs
M12000 Crane + Leader and M16000 Crane
30SB Junttan Impact Hammer
ICE 58B and ICE 110 Vibratory Hammer
CKE2500 Crane
Partnering with John Holland / Gamuda Joint Venture, Caporn Piling played a key role in delivering the deep foundation works for this transformational transport project, ensuring a safer, more efficient motorway network for New South Wales.