Main South Road, Stages 1 and 2, SA
The Main South Road – Stage 2 upgrade is a key infrastructure project improving connectivity and transport efficiency in South Australia. As part of this development, the Aldinga Interchange Bridge will enhance road safety and capacity, supporting the region's growth and accessibility.
Project Scope:
Installation of 53 CFA piles (900mm diameter) up to 23 meters deep
2 PDA tests conducted to ensure structural integrity
Project Value: $1,600,000
Equipment:
Caporn Piling utilised a range of specialised equipment to deliver this project, including the BG45V piling rig, 100t crawler crane, concrete pump, and 12t excavator.
In collaboration with CPB Contractors Pty Limited, Caporn Piling is proud to contribute to this vital transport infrastructure, reinforcing South Australia’s road network for safer and more efficient travel.
The Main South Road – Stage 2 upgrade is a key infrastructure project improving connectivity and transport efficiency in South Australia. As part of this development, the Aldinga Interchange Bridge will enhance road safety and capacity, supporting the region's growth and accessibility.
Project Scope:
Installation of 53 CFA piles (900mm diameter) up to 23 meters deep
2 PDA tests conducted to ensure structural integrity
Project Value: $1,600,000
Equipment:
Caporn Piling utilised a range of specialised equipment to deliver this project, including the BG45V piling rig, 100t crawler crane, concrete pump, and 12t excavator.
In collaboration with CPB Contractors Pty Limited, Caporn Piling is proud to contribute to this vital transport infrastructure, reinforcing South Australia’s road network for safer and more efficient travel.