0
Skip to Content
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Home
Folder: What We Do
Back
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Folder: Who We Are
Back
Our History
Our Team
Our Strategy
Careers
Folder: Contact
Back
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Nelligen 1.jpg
Nelligen 2.jpg
Nelligen 4.jpg
Nellligen 3..jpg

Nelligen Bridge, NSW

$0.00

Caporn Piling is honoured to contribute to the Nelligen Bridge Replacement project, a vital new two-lane bridge over the Clyde River designed to provide a safe and reliable crossing for generations to come. With a 100-year design life, this bridge is a testament to modern engineering and infrastructure excellence.

Project Scope:

  • Installation of permanently lined bored piles, including:

    • Abutment A: 3 No. 1200mm

    • Piers 1 and 2: 2 No. 1500mm each

    • Piers 3 to 10: 4 No. 1500mm each

    • Abutment B: 16 No. 900mm

    • North Retaining Wall: 19 No. 900mm

Project Value: Approximately $18,456,954

Equipment:
To meet the project's technical demands, we deployed advanced machinery, including:

  • BG45 and BG28 drill rigs

  • ICE110C and ICE58 B vibratory hammers

  • 8T Excavator.

Working in partnership with Seymour Whyte Constructions Pty Ltd, Caporn Piling delivered a solid foundation for this iconic infrastructure, ensuring the safety and efficiency of the Clyde River crossing for decades to come.

Projects Nelligen Bridge, NSW
Quantity:
Add To Cart

Caporn Piling is honoured to contribute to the Nelligen Bridge Replacement project, a vital new two-lane bridge over the Clyde River designed to provide a safe and reliable crossing for generations to come. With a 100-year design life, this bridge is a testament to modern engineering and infrastructure excellence.

Project Scope:

  • Installation of permanently lined bored piles, including:

    • Abutment A: 3 No. 1200mm

    • Piers 1 and 2: 2 No. 1500mm each

    • Piers 3 to 10: 4 No. 1500mm each

    • Abutment B: 16 No. 900mm

    • North Retaining Wall: 19 No. 900mm

Project Value: Approximately $18,456,954

Equipment:
To meet the project's technical demands, we deployed advanced machinery, including:

  • BG45 and BG28 drill rigs

  • ICE110C and ICE58 B vibratory hammers

  • 8T Excavator.

Working in partnership with Seymour Whyte Constructions Pty Ltd, Caporn Piling delivered a solid foundation for this iconic infrastructure, ensuring the safety and efficiency of the Clyde River crossing for decades to come.

Projects Nelligen Bridge, NSW

Expert Piling Solutions Start Here – Request a Quote Now

Contact Us for Expert Piling Advice
Name *

Thanks for your enquiry.
Our expert team will be in touch shortly.

Queensland Head Office

139-169 Potassium Street
Narangba, QLD 4504
P: +61 7 3889 3989
E: admin@capornpiling.com.au

Queensland Gold Coast

18/240 Varsity Parade
Varsity Lakes, Qld 4227
P: +61 7 38893989
E: admin@capornpiling.com.au

New South Wales Office

30-32 Barcoo Street
Roseville, NSW 2069
P: +61 2 9882 3817
E: admin@capornpiling.com.au

South Australia Office

22 Greenhill Road
Wayville, SA 5034
P: +61 8 8372 7808
E: admin@capornpiling.com.au


Featured Projects
Bored Piles
CFA Piles
Design & Construct
Marine Piles

Driven Concrete Piles
Down the Hole Hammer
Driven Steel Tubular Piles
Retaining Walls
Ground Improvement

Specialist Applications
Support Fluids
Temporary Access Bridges
FAQ’s

Copyright © 2025 Caporn Piling