Oaky Creek Bridge Replacement, QLD

$0.00

The Oaky Creek Bridge Replacement is a critical rail infrastructure project on the electrified North Coast rail line, located approximately 30 km south of Rockhampton. The project involved constructing a new eight-span concrete bridge to enhance rail safety and reliability. Given the time-sensitive planned track closure, Caporn Piling deployed four dedicated crews to enable 24/7 operations, ensuring the project was completed efficiently within the restricted timeframe.

Project Scope:

  • 4 bored piles (1,200mm diameter)

  • 12 bored piles (1,500mm diameter)

  • Piles permanently lined and extending up to 28 metres deep

Project Value:

  • Approximately $4,750,000

Equipment:

  • 2 x BG28V Piling Rigs

  • 2 x CKE2500 Cranes

  • 1 x M12000 Crane

  • Junttan 14T Hammer

  • 2 x ICE58b Vibrators, 1 x PTC30HV Vibrator

  • 8T Excavator & EWP

Partnering with Queensland Bridge & Civil, Caporn Piling successfully delivered this high-priority rail infrastructure upgrade, ensuring minimal disruption to one of Queensland’s busiest rail corridors.

The Oaky Creek Bridge Replacement is a critical rail infrastructure project on the electrified North Coast rail line, located approximately 30 km south of Rockhampton. The project involved constructing a new eight-span concrete bridge to enhance rail safety and reliability. Given the time-sensitive planned track closure, Caporn Piling deployed four dedicated crews to enable 24/7 operations, ensuring the project was completed efficiently within the restricted timeframe.

Project Scope:

  • 4 bored piles (1,200mm diameter)

  • 12 bored piles (1,500mm diameter)

  • Piles permanently lined and extending up to 28 metres deep

Project Value:

  • Approximately $4,750,000

Equipment:

  • 2 x BG28V Piling Rigs

  • 2 x CKE2500 Cranes

  • 1 x M12000 Crane

  • Junttan 14T Hammer

  • 2 x ICE58b Vibrators, 1 x PTC30HV Vibrator

  • 8T Excavator & EWP

Partnering with Queensland Bridge & Civil, Caporn Piling successfully delivered this high-priority rail infrastructure upgrade, ensuring minimal disruption to one of Queensland’s busiest rail corridors.