0
Skip to Content
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Home
Folder: What We Do
Back
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Folder: Who We Are
Back
Our History
Our Team
Our Strategy
Careers
Folder: Contact
Back
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
20240605_091641.jpg
20240306_104744.jpg

Rockhampton Ring Road, Qld

$0.00

The Rockhampton Ring Road is a transformative infrastructure project designed to enhance the Bruce Highway, delivering improved flood resilience, freight efficiencies, and road safety for Central Queensland. The North Package Stage 1 includes the construction of a six-span bridge over Limestone Creek, a key component of this major transport upgrade.

Project Scope:

  • 50 permanently lined bored piles (1,200mm diameter)

  • Pile depths reaching up to 32 metres

Project Value:

  • Approximately $5,200,000

Equipment:

  • BG24H Piling Rig

  • M12000 Crane

  • ICE 58B Vibrator

  • 14T Excavator

In collaboration with BMD Bielby RRR JV, Caporn Piling played a crucial role in delivering the foundation works for this essential project, ensuring a safer, more efficient, and flood-resilient transport network for Queensland.

Projects Rockhampton Ring Road, Qld
Quantity:
Add To Cart

The Rockhampton Ring Road is a transformative infrastructure project designed to enhance the Bruce Highway, delivering improved flood resilience, freight efficiencies, and road safety for Central Queensland. The North Package Stage 1 includes the construction of a six-span bridge over Limestone Creek, a key component of this major transport upgrade.

Project Scope:

  • 50 permanently lined bored piles (1,200mm diameter)

  • Pile depths reaching up to 32 metres

Project Value:

  • Approximately $5,200,000

Equipment:

  • BG24H Piling Rig

  • M12000 Crane

  • ICE 58B Vibrator

  • 14T Excavator

In collaboration with BMD Bielby RRR JV, Caporn Piling played a crucial role in delivering the foundation works for this essential project, ensuring a safer, more efficient, and flood-resilient transport network for Queensland.

Projects Rockhampton Ring Road, Qld

Expert Piling Solutions Start Here – Request a Quote Now

Contact Us for Expert Piling Advice
Name *

Thanks for your enquiry.
Our expert team will be in touch shortly.

Queensland Head Office

139-169 Potassium Street
Narangba, QLD 4504
P: +61 7 3889 3989
E: admin@capornpiling.com.au

Queensland Gold Coast

18/240 Varsity Parade
Varsity Lakes, Qld 4227
P: +61 7 38893989
E: admin@capornpiling.com.au

New South Wales Office

30-32 Barcoo Street
Roseville, NSW 2069
P: +61 2 9882 3817
E: admin@capornpiling.com.au

South Australia Office

22 Greenhill Road
Wayville, SA 5034
P: +61 8 8372 7808
E: admin@capornpiling.com.au


Featured Projects
Bored Piles
CFA Piles
Design & Construct
Marine Piles

Driven Concrete Piles
Down the Hole Hammer
Driven Steel Tubular Piles
Retaining Walls
Ground Improvement

Specialist Applications
Support Fluids
Temporary Access Bridges
FAQ’s

Copyright © 2025 Caporn Piling