Scone Bypass, NSW
The new Scone Bypass has removed around 500 heavy vehicles from the town centre of Scone and will improve traffic flow, travel times, and safety for all road users.
Caporn was delivered bored piles for three large bridges
Kelly Street South Loop ( 64.5 m long ) and consisted of three spans, each 21.5 m in length with central span crossing over Kelly Street.
Main Northern Railway Bridge (99.5 m long) and consisted of three spans, with the central span crossing the existing rail line.
Parson’s Gully Bridge (540m) consisting of twenty spans, each 27m in length.
SCOPE:
37 No. 1050mm permanently cased bored piles.
42 No. 1500mm permanently cased bored piles.
CSL testing
VALUE: $7m
EQUIPMENT:
2No. Bauer BG28
3No. Crawler Cranes 100 to 150tn
2No. ICE 58B vibratory hammer
Polymer plant
CLIENT:Daracon Group
The new Scone Bypass has removed around 500 heavy vehicles from the town centre of Scone and will improve traffic flow, travel times, and safety for all road users.
Caporn was delivered bored piles for three large bridges
Kelly Street South Loop ( 64.5 m long ) and consisted of three spans, each 21.5 m in length with central span crossing over Kelly Street.
Main Northern Railway Bridge (99.5 m long) and consisted of three spans, with the central span crossing the existing rail line.
Parson’s Gully Bridge (540m) consisting of twenty spans, each 27m in length.
SCOPE:
37 No. 1050mm permanently cased bored piles.
42 No. 1500mm permanently cased bored piles.
CSL testing
VALUE: $7m
EQUIPMENT:
2No. Bauer BG28
3No. Crawler Cranes 100 to 150tn
2No. ICE 58B vibratory hammer
Polymer plant
CLIENT:Daracon Group