0
Skip to Content
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Home
Folder: What We Do
Back
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Folder: Who We Are
Back
Our History
Our Team
Our Strategy
Careers
Folder: Contact
Back
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Scone 2.JPG
SconeIMG_1309.JPG

Scone Bypass, NSW

$0.00

The new Scone Bypass has removed around 500 heavy vehicles from the town centre of Scone and will improve traffic flow, travel times, and safety for all road users.
Caporn was delivered bored piles for three large bridges

Kelly Street South Loop ( 64.5 m long ) and consisted of three spans, each 21.5 m in length with central span crossing over Kelly Street.

Main Northern Railway Bridge (99.5 m long) and consisted of three spans, with the central span crossing the existing rail line.

Parson’s Gully Bridge (540m) consisting of twenty spans, each 27m in length.

SCOPE:

  • 37 No. 1050mm permanently cased bored piles.

  • 42 No. 1500mm permanently cased bored piles.

  • CSL testing

VALUE: $7m

EQUIPMENT:

  • 2No. Bauer BG28

  • 3No. Crawler Cranes 100 to 150tn

  • 2No. ICE 58B vibratory hammer

  • Polymer plant

CLIENT:Daracon Group

Projects Scone Bypass, NSW
Quantity:
Add To Cart

The new Scone Bypass has removed around 500 heavy vehicles from the town centre of Scone and will improve traffic flow, travel times, and safety for all road users.
Caporn was delivered bored piles for three large bridges

Kelly Street South Loop ( 64.5 m long ) and consisted of three spans, each 21.5 m in length with central span crossing over Kelly Street.

Main Northern Railway Bridge (99.5 m long) and consisted of three spans, with the central span crossing the existing rail line.

Parson’s Gully Bridge (540m) consisting of twenty spans, each 27m in length.

SCOPE:

  • 37 No. 1050mm permanently cased bored piles.

  • 42 No. 1500mm permanently cased bored piles.

  • CSL testing

VALUE: $7m

EQUIPMENT:

  • 2No. Bauer BG28

  • 3No. Crawler Cranes 100 to 150tn

  • 2No. ICE 58B vibratory hammer

  • Polymer plant

CLIENT:Daracon Group

Projects Scone Bypass, NSW

Expert Piling Solutions Start Here – Request a Quote Now

Contact Us for Expert Piling Advice
Name *

Thanks for your enquiry.
Our expert team will be in touch shortly.

Queensland Head Office

139-169 Potassium Street
Narangba, QLD 4504
P: +61 7 3889 3989
E: admin@capornpiling.com.au

Queensland Gold Coast

18/240 Varsity Parade
Varsity Lakes, Qld 4227
P: +61 7 38893989
E: admin@capornpiling.com.au

New South Wales Office

30-32 Barcoo Street
Roseville, NSW 2069
P: +61 2 9882 3817
E: admin@capornpiling.com.au

South Australia Office

22 Greenhill Road
Wayville, SA 5034
P: +61 8 8372 7808
E: admin@capornpiling.com.au


Featured Projects
Bored Piles
CFA Piles
Design & Construct
Marine Piles

Driven Concrete Piles
Down the Hole Hammer
Driven Steel Tubular Piles
Retaining Walls
Ground Improvement

Specialist Applications
Support Fluids
Temporary Access Bridges
FAQ’s

Copyright © 2025 Caporn Piling