Wambo Ventilation Shaft, NSW
The Wambo Mine is a major open-cut and underground coal mining operation in regional NSW. Following a ground failure in a previously constructed shaft, a new upcast shaft was required to support long-term (LOM) ventilation, ensuring continued safe and efficient mining operations.
Project Scope:
1 ventilation shaft (3.7m diameter), permanently cased
Project Value:
Approximately $1,350,000
Equipment:
BG45 Piling Rig
58B Vibrator
CKE2500 Crane
EWP
Partnering with Peabody Mining, Caporn Piling successfully delivered this critical mine ventilation infrastructure, ensuring enhanced air circulation and operational safety for underground mining activities.
The Wambo Mine is a major open-cut and underground coal mining operation in regional NSW. Following a ground failure in a previously constructed shaft, a new upcast shaft was required to support long-term (LOM) ventilation, ensuring continued safe and efficient mining operations.
Project Scope:
1 ventilation shaft (3.7m diameter), permanently cased
Project Value:
Approximately $1,350,000
Equipment:
BG45 Piling Rig
58B Vibrator
CKE2500 Crane
EWP
Partnering with Peabody Mining, Caporn Piling successfully delivered this critical mine ventilation infrastructure, ensuring enhanced air circulation and operational safety for underground mining activities.