The Waratah Super Battery Project is a landmark energy infrastructure development designed to enhance grid stability and support renewable energy integration in New South Wales. As part of this initiative, Caporn Piling was engaged to construct transmission pole foundations essential for the project’s high-capacity energy storage system.

Project Scope:

  • 12 transmission pole foundations across 6 sites

  • Utilisation of bored piles and anchors for structural stability

Project Value:

  • Approximately $5,400,000

Equipment:

  • BG24H

  • BG28H

  • Soilmec SM401-077A

  • 12t excavator

  • Crane Truck

  • Skid Steer

Partnering with Zinfra Pty Ltd, Caporn Piling played a critical role in supporting this cutting-edge energy infrastructure, reinforcing the future of renewable energy storage in New South Wales.

The Waratah Super Battery Project is a landmark energy infrastructure development designed to enhance grid stability and support renewable energy integration in New South Wales. As part of this initiative, Caporn Piling was engaged to construct transmission pole foundations essential for the project’s high-capacity energy storage system.

Project Scope:

  • 12 transmission pole foundations across 6 sites

  • Utilisation of bored piles and anchors for structural stability

Project Value:

  • Approximately $5,400,000

Equipment:

  • BG24H

  • BG28H

  • Soilmec SM401-077A

  • 12t excavator

  • Crane Truck

  • Skid Steer

Partnering with Zinfra Pty Ltd, Caporn Piling played a critical role in supporting this cutting-edge energy infrastructure, reinforcing the future of renewable energy storage in New South Wales.