0
Skip to Content
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Caporn Piling
Home
What We Do
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Who We Are
Our History
Our Team
Our Strategy
Careers
Contact
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
Home
Folder: What We Do
Back
Bored Piling
CFA Piling
Design & Construct
Driven Concrete Piling
Down the Hole Hammer
Driven Steel Tubular Piling
Ground Improvement
Marine Piling
Retaining Walls
Specialist Applications
Support Fluids
Temp. Access Bridges
Equipment
Projects
Folder: Who We Are
Back
Our History
Our Team
Our Strategy
Careers
Folder: Contact
Back
Queensland Head Office
Queensland Gold Coast
New South Wales
South Australia
yandi nepean bridge .jpeg

Yandhai Nepean Crossing – Penrith, NSW

$0.00

Caporn Piling is proud to have delivered critical foundation solutions for the Yandhai Nepean Crossing, an iconic 258-metre-long single-span triangular truss bridge over the Nepean River. This record-breaking pedestrian bridge, the longest single clear-span footbridge in the southern hemisphere, creates a landmark that combines engineering innovation with community connectivity.

Project Scope

Caporn Piling’s contribution included:

  • Installation of 20 permanent cased bored piles (900mm to 1500mm diameter, up to 25m deep) to support the bridge structure.

  • Design, installation, and removal of temporary launch structures within the Nepean River to facilitate bridge assembly and installation.

Equipment Utilised

  • Drill Rigs: Bauer BG28, BG30, BG20 for precision piling.

  • Crawler Cranes: 2 x Manitowoc M12000 for heavy lifting.

  • Marine equipment:

    • Modular barge and service barge.

    • Workboats for river-based operations.

Client

Seymour Whyte Construction

Project Highlights

  • 258m total bridge length with a 200m main span, designed as a triangular steel Warren truss with curved steel-concrete composite approaches.

  • Unique features include viewing platforms, balconies, and architecturally-designed feature lighting to enhance aesthetics.

  • Landscaping and shared path connections (455m) integrate the bridge seamlessly into the local network.

Legacy and Benefits

  • Improved community connectivity for pedestrians and cyclists, linking Penrith’s key recreational areas and pathways.

  • A world-class pedestrian bridge that showcases engineering excellence and innovative construction solutions.

  • Restored land use and enhanced landscaping to fit within the natural river environment.

  • Recognition as an engineering benchmark, inspiring future generations.

“The Project Team has created an integrated infrastructure solution that reflects engineering excellence, creativity, and sets new benchmarks for Penrith.” – Stuart Ayres MP, Member for Penrith

At Caporn Piling, we are proud to have delivered the strong foundations and temporary structures that made the Yandhai Nepean Crossing a reality. This project demonstrates our ability to solve complex challenges through technical expertise, precision, and collaboration, leaving a lasting legacy for the people of Penrith.

Projects Yandhai Nepean Crossing – Penrith, NSW
Quantity:
Add To Cart

Caporn Piling is proud to have delivered critical foundation solutions for the Yandhai Nepean Crossing, an iconic 258-metre-long single-span triangular truss bridge over the Nepean River. This record-breaking pedestrian bridge, the longest single clear-span footbridge in the southern hemisphere, creates a landmark that combines engineering innovation with community connectivity.

Project Scope

Caporn Piling’s contribution included:

  • Installation of 20 permanent cased bored piles (900mm to 1500mm diameter, up to 25m deep) to support the bridge structure.

  • Design, installation, and removal of temporary launch structures within the Nepean River to facilitate bridge assembly and installation.

Equipment Utilised

  • Drill Rigs: Bauer BG28, BG30, BG20 for precision piling.

  • Crawler Cranes: 2 x Manitowoc M12000 for heavy lifting.

  • Marine equipment:

    • Modular barge and service barge.

    • Workboats for river-based operations.

Client

Seymour Whyte Construction

Project Highlights

  • 258m total bridge length with a 200m main span, designed as a triangular steel Warren truss with curved steel-concrete composite approaches.

  • Unique features include viewing platforms, balconies, and architecturally-designed feature lighting to enhance aesthetics.

  • Landscaping and shared path connections (455m) integrate the bridge seamlessly into the local network.

Legacy and Benefits

  • Improved community connectivity for pedestrians and cyclists, linking Penrith’s key recreational areas and pathways.

  • A world-class pedestrian bridge that showcases engineering excellence and innovative construction solutions.

  • Restored land use and enhanced landscaping to fit within the natural river environment.

  • Recognition as an engineering benchmark, inspiring future generations.

“The Project Team has created an integrated infrastructure solution that reflects engineering excellence, creativity, and sets new benchmarks for Penrith.” – Stuart Ayres MP, Member for Penrith

At Caporn Piling, we are proud to have delivered the strong foundations and temporary structures that made the Yandhai Nepean Crossing a reality. This project demonstrates our ability to solve complex challenges through technical expertise, precision, and collaboration, leaving a lasting legacy for the people of Penrith.

Projects Yandhai Nepean Crossing – Penrith, NSW

Expert Piling Solutions Start Here – Request a Quote Now

Contact Us for Expert Piling Advice
Name *

Thanks for your enquiry.
Our expert team will be in touch shortly.

Queensland Head Office

139-169 Potassium Street
Narangba, QLD 4504
P: +61 7 3889 3989
E: admin@capornpiling.com.au

Queensland Gold Coast

18/240 Varsity Parade
Varsity Lakes, Qld 4227
P: +61 7 38893989
E: admin@capornpiling.com.au

New South Wales Office

30-32 Barcoo Street
Roseville, NSW 2069
P: +61 2 9882 3817
E: admin@capornpiling.com.au

South Australia Office

22 Greenhill Road
Wayville, SA 5034
P: +61 8 8372 7808
E: admin@capornpiling.com.au


Featured Projects
Bored Piles
CFA Piles
Design & Construct
Marine Piles

Driven Concrete Piles
Down the Hole Hammer
Driven Steel Tubular Piles
Retaining Walls
Ground Improvement

Specialist Applications
Support Fluids
Temporary Access Bridges
FAQ’s

Copyright © 2025 Caporn Piling